AS 3745, the standard for planning for emergencies in a facility

AS 3745-2010 sets out a framework for emergency planning in a facility — an emergency plan, response procedures and an emergency control organisation. We confirmed the current designation directly. A regulator citation search for it specifically was not completed in our research.

Last updated 2026-08-24

What it is

AS 3745-2010, incorporating Amendment No. 1 (2014) and Amendment No. 2 (2018), is titled "Planning for emergencies in facilities."

In our own words: it sets out a structured approach to planning a facility’s response to an emergency — establishing a planning committee, writing an emergency plan, defining response procedures and setting up an emergency control organisation of trained staff. It sits above both the sprinkler system a plan assumes is working and the servicing standard that keeps that assumption true as the human-response layer over the physical fire-protection layer.

What we have not checked

No search or fetch specifically targeting a regulator citation for AS 3745 was completed in this round of research. Given how often standards elsewhere in this reference turned out to be named inside model Codes of Practice once we could actually read them, a citation for AS 3745 in a Safe Work Australia emergency-response guidance document seems plausible — but plausible is not confirmed, and we are treating why we could not confirm a regulator citation for this one as the honest answer rather than an assumption to build on.

What we may not tell you

No committee-composition rule, drill frequency or emergency-control-organisation staffing ratio from AS 3745 appears here. What the standard specifies as the mechanics of a plan is inside the document.

What we can say, in general terms, is that the standard treats a plan as something to be tested, not just written and filed. What "tested" means in practice — how often, and by what method — is again a question for the document itself, not this page.

Where an emergency plan actually connects to a warehouse floor

A plan is only as good as the site it describes. That means accounting for traffic management inside the warehouse during an evacuation, and for a confined space that complicates an evacuation route if one exists on site. It also means knowing what the signage that guides people during an evacuation can and cannot rely on — wayfinding under pressure is a design question the plan has to answer, not the signage standard alone.

A written plan that has never been walked through by the people expected to use it is a document, not a working plan. That distinction sits underneath a lot of the value in AS 3745, and it is one no standard, on its own, can make true for a given site.

Common questions

What does AS 3745 cover?
A framework for planning a facility’s emergency response — the plan itself, response procedures and an emergency control organisation of trained staff, not the physical fire-protection equipment.
Does a regulator cite AS 3745?
We have not completed a search to check. This is a gap in our current research rather than a confirmed no.
Does AS 3745 replace a fire evacuation drill I have to run anyway?
No. It sets out how to plan and structure emergency response. What drills or exercises a specific site needs is a decision the plan itself has to make, informed by the standard, not dictated word for word by it on this page.
Is an emergency control organisation the same as a fire warden?
A fire warden role is one part of the wider emergency control organisation structure AS 3745 sets out — the standard describes a fuller structure than a single role, though we do not reproduce its detail here.
Does AS 3745 apply to every type of building?
It is written as a general facility-planning framework rather than being scoped to one building type, but which parts of it a given site actually needs to apply is a judgement the plan itself has to make, informed by the building and its occupants.